Katsina State Governor Dikko Radda has praised President Bola Tinubu for approving the expansion of an electricity substation in Kankia Local Government Area. This upgrade is part of broader efforts to enhance the region's electricity supply and improve economic activities, reflecting the government's commitment to infrastructure development in Nigeria.
In addition to the Kankia project, the Federal Government has also initiated the construction of a new 120MVA power substation in Mashi, Katsina. This facility, being developed by the Transmission Company of Nigeria (TCN), aims to bolster electricity transmission capabilities in the area, which has been a critical need for local businesses and residents alike. The substation is designed to operate at a capacity of 120 megavolt-amperes (MVA), significantly increasing the reliability of power supply in the region.S2S3
The groundbreaking ceremony for the Mashi substation took place recently, with Minister of Power Joseph Tegbe announcing that the project is expected to be completed by March 2027. This development is seen as a vital step towards strengthening the electricity transmission network in Katsina State, which has faced challenges in meeting the growing demand for power. The expansion and new construction efforts are part of a larger strategy to enhance Nigeria's energy infrastructure and support economic growth.S3