Nepal has received approval to import up to 350 megawatts of electricity from India this winter to meet domestic power demand, as falling hydropower output and flood damage to several projects strain its supply. India's Central Electricity Authority, under the Ministry of Power, has authorised the state-owned Nepal Electricity Authority to buy electricity at competitive rates through the Indian Energy Exchange for up to 17 hours a day. The approval is valid from November 17, 2026, to July 31, 2027, and is expected to help Nepal bridge the seasonal gap between demand and domestic generation, according to NEA Managing Director Dirghayu Kumar Shrestha.
Of the approved capacity, Nepal can import 300 MW through the Kataiya-Kushaha, Ramnagar-Surajpura and Raxaul-Parwanipur transmission lines, with the remaining 50 MW available through the New Nautanwa-Mainahiya line. The need for imports stems from Nepal's heavy reliance on run-of-the-river hydropower, which makes generation highly seasonal. Rising river flows in summer allow the country to produce surplus power for export, mainly to India, but declining water levels in winter sharply cut domestic output.S1S2
Supply has been further squeezed by the Rasuwa-Bhotekoshi floods in August, which damaged several hydropower projects in central Nepal. Projects with a combined installed capacity of 431 MW remain disconnected from the national grid. Officials expect domestic generation to improve from mid-April as river levels rise, which would reduce dependence on imported electricity and could allow Nepal to resume exports.S1S2